How we work

Built in the factory. Live in half the time.

Speed doesn't come from working faster. It comes from removing the waiting. One ecosystem, parallel processes and scalable capacity: that is how we deliver data center infrastructure faster, consistently, not occasionally.

  • 7 vs 18months from permit to live capacity, against a well-run traditional build
  • 5 to 6months from engineering start to the first modules ready, for well-defined projects
  • 100%factory-built and FAT-tested before delivery
  • 35+service and sales locations
USPs

Why build with Kontena

What separates Kontena from a component vendor, a general contractor, and anyone selling a catalog module.

Independence

Vendor-independent by design

We're the architect and integrator, not a component manufacturer, so hardware-agnostic isn't a claim, it's how we're built. Your racks, your suppliers, your choice, today and tomorrow.

Scale

One team to talk to

Integrated design, MEP specialists worldwide and German steel production at industrial scale. One contract, one accountable team, no hand-offs.

Fit

Bespoke, at industrial speed

Standard blocks configured to your site, and fully custom building blocks where the site, the regulations or the load demand it. The fit is custom; the lead time isn't.

Density

Built for future density

Up to +300 kW per rack, with a dual-loop system that removes almost all heat at the chip. Heat rejection is chosen per site and climate: dry coolers, chillers, cooling towers or heat recovery.

Certainty

Fixed price. Fixed schedule.

Everyone promises speed; almost no one guarantees it. Factory-built and factory-tested modules let us commit to a price and a date before we start, and hold them.

End to end

From idea to live capacity

Site brokerage, feasibility, engineering, build, MEP and operations under one roof. If you don't have a site yet, we can find one, and then build on it.

Capability

One accountable team.

Design, MEP and manufacturing of high performance computing infrastructure under one structure: no hand-offs, no gaps between disciplines.

Hand holding printed layout drawings of a data room in front of modules in production
01

Engineering & Production

  • From concept through design, engineering and commissioning
  • In-house design and engineering
  • Industrialized delivery model for fast and predictable rollouts
Rooftop plant with air handling units, ductwork, piping and cooling towers
02

MEP specialist

  • Complex MEP delivery for the most demanding environments
  • Deep expertise in high-density, high-availability infrastructure
  • Execution capacity for multiple large-scale projects worldwide
Production hall with steel frames and base plates ready for assembly
03

Steel works

  • Scaled, high-quality manufacturing
  • In-house structural engineering office
  • Dedicated installation teams, from factory to site
Accredited Silver+ SupplierAchilles Network
3-Star Sustainability RatingAchilles ID 00266421
35+ locationsservice and sales
In-housedesign, engineering and production
Why it matters

Broad design. Big throughput. Any scale.

Design, engineering, MEP and production all in-house, in one team. That changes what is possible: in design capacity, in production volume and in the size of project we can take on.

Design capacity

A broad design team

Design, engineering, MEP and installation experts in a single integrated pool. No hand-offs, no gaps, just seamless execution.

Production volume

Industrial-scale throughput

In-house production, multiple assembly halls and large yards deliver true factory-scale capacity for modular data center components, for fast and repeatable large-scale deployments across Europe. Today about 150 MW of modules a year, with room to grow.

Any project size

Small and big projects alike

From a single data room to a multi-site program, the same ecosystem scales to fit. No project too small, none too large.

No lock-in

Hardware-agnostic, brand independent

Best-in-class technology for every project. Never locked into one vendor or proprietary stack: your racks, your suppliers, your choice. A supplier who cannot hold a date is routed around, not waited on.

What we do
  • AI/HPC solutions
  • HPC data centers
  • Prototyping & production
  • Energy solutions
  • Business planning
  • Cooling & heat recovery
  • Brokerage
How it is built

From an empty plot to live capacity.

Six steps, the same on every campus. Design happens once, site works happen once, and the blocks repeat.

  1. We start from your plot, your grid connection and your load. The campus layout is fixed early: where the blocks go, how power and cooling run, where trucks and people enter. It is also the basis for your permit.

  2. One block is engineered down to the last cable tray, and every phase repeats it. Long-lead equipment such as transformers and switchgear is ordered at contract award, so it stays off the critical path.

  3. When the permit lands, site works start for the whole campus at once: groundworks, foundations, cable and pipe routes, roads, fencing and the grid connection. Done once, ready for every phase.

  4. Meanwhile data rooms, E-Houses and cooling skids are built in our own assembly halls. Every module is wired, piped and factory acceptance tested before it leaves.

  5. Modules arrive by truck and are set by crane on the prepared foundations. What is left on site is connecting power, cooling and network between the blocks.

  6. Each phase is commissioned and site acceptance tested, then handed over and goes live. The next phase is already being set beside it.

Site concept design: two Kontena engineers reviewing a 3D design and module drawings at the table
Fabrication ready design: model of Kontena modules on top of the layout drawings
Site preparation: a Kontena data room on a prepared industrial plot, a tower crane behind it
Fabrication and FAT: an open Kontena data room module with racks and cable trays in our assembly hall
Deployment and hook-up: a Kontena technician connecting the power cabling of a data room module
Commissioning and SAT: the mechanical yard of a Kontena data center with dry coolers on a raised deck
Speed in practice

Live in half the time.

Traditional builds run one discipline after another; we run them in parallel. Long-lead equipment is released at contract award, and the moment the permit lands, fabrication design is done and site works begin. Modules arrive FAT-tested and are connected as they land, leaving only setting, hook-up and commissioning on site.

7 vs 18months

From permit to live capacity, against a well-run traditional build.

11months

Earning capacity before a traditional build goes live.

Indicative schedule from our reference example. First modules can be ready in as little as five to six months after engineering start. Exact timing depends on the project.

Speed at scale

The site earns while it grows.

A 40 MW campus built in 10 MW phases. Designed once, then fabrication, deployment and commissioning overlap across phases: the first 10 MW goes live 7 months after the permit, with a new phase every 6 weeks. A traditional build delivers all 40 MW at once, in about 22 months.

ParallelMonth 7

First 10 MW live, the full 40 MW by month 11.5.

~13months

Of full site revenue before the traditional site opens.

Indicative schedule for a 40 MW reference campus. Exact timing depends on the project.

Speed in practice

Fast. Repeatable. Scalable.

The system delivers consistent speed across projects of different sizes.

  1. 01From day one

    Concept first, then a firm price

    A concept design of about four weeks fixes the design basis and ends in a firm price. Critical long-lead items are ordered right after, removing them months from the traditional critical path.

  2. 02In parallel

    Base load plus scalable ramp-up

    Strong base production capacity, with output increased significantly for larger programs, all in our own production.

  3. 03Staged

    Predictable delivery

    Every module is FAT-tested in our factory and ships as soon as it passes. Site works begin earlier, while non-critical parts of the system are still in production.

  4. 04From 5 months

    First modules live

    Well-defined projects can move from engineering start to first modules ready in as little as five to six months, thanks to parallel execution and pre-engineered blocks.

Where we are

Close to where you build.

A map of our flagship sites: assembly and production facilities, service centers and sales offices, close to the projects we deliver in Europe and North America.

  • 35+Service and sales locations
Map of North America and Europe with Kontena sales offices, production facilities and service centers
Get in touch

Tell us your load, your site and your timeline.

We come back with a first configuration and a schedule.