Switchgear
Low voltage main switchboards with a utility and a standby incomer, and a paralleling section for two generator sets.
Whitespace, power, cooling and connectivity from one ecosystem: modular datacenter infrastructure engineered together, so what lands on site is a working system rather than a construction project.
WhitespaceData Room2 level whitespace moduleWhitespace for the densest AI hardware, fully wired, piped and FAT-tested. Built for up to +300 kW per rack.
WhitespaceUtility BridgePower, cooling and cabling overheadUtilities on an open frame above the racks, so the floor stays clear and the layout follows the hardware.
PowerE-HousePower distributionPower distribution in a factory-built module, delivered tested and ready to connect.
CoolingCoolingMechanical yard: pumps, dry coolers, chillersHeat rejection chosen per site and climate: dry coolers, chillers, cooling towers or heat recovery.
SupportStorage/OfficeSupport spacesOffice, storage, meet-me-room and vestibule modules, built with the same factory process.Every product connects to the next.See how they come together in the six solutions Power distribution
Switchgear, UPS and distribution in one factory-built steel module. Every E-House is wired and tested in our halls, then set beside the data hall and connected with short, prefabricated busways and cables.


Low voltage main switchboards with a utility and a standby incomer, and a paralleling section for two generator sets.
Modular double conversion UPS with lithium iron phosphate batteries for 5 to 10 minutes, in a separate, fire-rated compartment.
In a 4M3 layout four E-Houses each feed one line, and any three of them carry the full critical load.
UPS output, mechanical and auxiliary boards, with busway connections that run straight into the data hall.
Its own CRAH cooling and ventilation, so the electrical equipment stays in its comfort zone in every season.
Arc flash rated layout, fire detection and clean agent or aerosol suppression, access control and clear service aisles.
BMS and power monitoring points and the network switch for the controls, all pre-wired in the factory.
IEC and EN versions for Europe, UL listed switchboards and UPS for North America, at 50 or 60 Hz.
For inference loads the batteries can bridge grid events and close down cleanly, without a generator on site.
Typical values. Exact figures depend on the project.
We are vendor-independent. We build with the switchgear and UPS brands you prefer, or propose a proven set.
It can be. Smaller ratings fit in the module; larger ones stand on their own pad next to it.
Yes. Each power path has its own E-House, so a new one connects without touching the paths already running.
Yes. A retrofit E-House brings a UPS skid and a separate battery module, built as its own fire cell, next to halls that run without UPS today. Nothing is placed inside the halls and the existing busbars stay as they are.
Not always. For inference loads, lithium batteries can ride through grid events and finish what is running. Where standby power is needed, the E-House is ready for generator sets.
We come back with a first configuration and a schedule.
We use necessary cookies to make this site work. With your permission we also use analytics cookies to see how the site is used, and marketing cookies to measure our campaigns. You can change your choice at any time via Cookie settings at the bottom of every page. More in our privacy statement.