Data center solutions: six ways to build

Modular data center solutions from a single cluster to a large campus, outdoors or inside an existing building. Every solution uses the same factory-built, FAT-tested blocks; what changes is the scale and the setting.

Open a solution to see everything about it.
02 · Outdoor deployment

Repeatable modular data center block

One complete data center. Factory-built, ready to run. Start operating your live modular data center and grow on the same site, one block at a time. Every block is the same proven design: data rooms, power, cooling and connectivity, engineered together and delivered fully wired, piped and FAT-tested. Each new block goes in beside the last, while the first keeps running.

Outdoor
Render of a Kontena modular data center block with its raised cooling deck in a snowy forest at sunset, wind turbines behindRender of a 5 MW Kontena modular data center block at sunset on an industrial site: two data room levels beside the raised cooling platformRender of a Kontena modular data center block with a raised cooling deck in a mountain landscape
Example: 5 MW block in a winter environment, next to a wind farmExample: 5 MW block on an industrial siteExample: 5 MW block with a gated entrance
  • ~5 MWIT capacity per block
  • 2 levelsplant stacked above the ground floor
  • 5module types, one integrated system
  • 7 monthsfrom permit to the first block live
One block

One block, one modular data center.

Whitespace and power at ground level, cooling plant on a raised steel deck. Maximum capacity on a small plot, delivered as one integrated system.

  1. A double height hall with two rows of racks on the IT floor and busways, piping and trays on the level above. Built from twelve factory modules.

  2. Four E-Houses with their transformers, stacked on two levels, two along each long side of the hall. Four independent power paths; any three carry the full load.

  3. Dry coolers and chillers on a raised steel deck at one end of the hall: a direct liquid cooling loop on the dry coolers, a rear door loop on the chillers, both N+1.

  4. The hydraulic skids sit on the ground below the deck, piped in the factory and connected to the hall with short loops.

  5. Meet-me-room, storage, office and vestibule modules at the other end, built with the same factory process.

0102030405
Example: one block after a 3.8 MW reference design.
Start here, grow later

Block by block.

Start operating your live data center and grow on the same site. One bill of materials, one FAT procedure, one commissioning routine: every new block goes in beside the last, while the first keeps running.

Block 1. The first block goes live about seven months after the permit. Its own power and cooling chain, its own data hall.

  • Live
  • Being set and commissioned
  • Planned
Block 4Block 3Block 2Block 1
Speed at scale

The site earns while it grows.

A 40 MW campus built in 10 MW phases. Designed once, then fabrication, deployment and commissioning overlap across phases: the first 10 MW goes live 7 months after the permit, with a new phase every 6 weeks. A traditional build delivers all 40 MW at once, in about 22 months.

ParallelMonth 7

First 10 MW live, the full 40 MW by month 11.5.

~13months

Of full site revenue before the traditional site opens.

Indicative schedule for a 40 MW reference campus. Exact timing depends on the project.

Specifications

One block, typical figures.

Every block is configured to its site; these are the figures of a typical block.

Capacity
around 5 MW IT per block; reference block 3.8 MW
Modules
38 modules and skids per block, five module types
Footprint
about 41 x 14.4 m (134 ft 6 in x 47 ft 3 in) for the block itself
Data hall
18.0 x 8.4 m (59 ft 1 in x 27 ft 7 in), double height, two rows of racks
Racks
34 positions in the reference block; up to +300 kW per rack
Power
four independent paths, any three carry the full load; gensets optional
Cooling
direct liquid cooling on dry coolers (about 80%), rear doors on chillers; both N+1
Heat reuse
connection for heat recovery from the liquid loop
Design
EN 50600 Availability Class 3; Tier III design intent
Delivery
about 38 road deliveries; FAT in the factory, commissioning on site

Typical values. Exact figures depend on the project, the site and the hardware you choose.

FAQ

Questions about the MDC block

How big can one site get?

As big as the plot and the grid connection allow. Each block brings its own power and cooling chain, so the next block never depends on spare capacity in the last one.

Can we start smaller than a full block?

Yes. A block can go live with one row of racks first and add the second row later, through valves and busways that are already in place.

Do we need gensets?

That depends on your grid and your availability target. Gensets are an option per power path.

Can the heat be reused?

Yes. The liquid loop runs warm enough to feed a heat network or a process on site.

What happens on site?

Foundations, connecting the modules and commissioning. Everything else is built and tested in our halls.

Can modules be built before the site is ready?

Yes. Every block draws on the same modules, so they can be built ahead and held in stock. Modules built before a named site still fit the next one.

Get in touch

Tell us your load, your site and your timeline.

We come back with a first configuration and a schedule.