Earning while you build
The first power block runs while the next ones are still in production, so the campus earns from month seven instead of at the end.
Modular data center solutions from a single cluster to a large campus, outdoors or inside an existing building. Every solution uses the same factory-built, FAT-tested blocks; what changes is the scale and the setting.
On your own plot.
Complete data centers on your own plot. Four ways, from a single cluster to a full campus.
Inside a building.
The same engineering inside a building. Only the envelope is different.
Campus scale. Built in repeatable blocks. At 20 MW and beyond, schedule and coordination decide whether a project succeeds. We deliver large AI and HPC data centers turn-key, built from the same proven blocks we use for a single deployment, produced in parallel and delivered in phases.
Outdoor


Every campus is built up from the same layers. Each layer is a set of factory-built blocks that connect to the one below.
Groundworks, foundations, cable and pipe routes, roads and fencing for the whole plot. Done once, at the start, while the blocks are in production.
Grid connection and substation, transformers, stacked E-Houses with switchgear, UPS and distribution, and gensets for backup power.
Two level data halls for high-density AI and HPC racks: IT on the ground floor, power and piping on the level above. A corridor spine links the halls to the E-Houses.
A platform against the data halls with dry coolers and chillers on top and pump skids below, chosen per site and climate and piped in the factory.
Meet-me-room, offices, storage and logistics, gatehouse, entrance security and parking.
The first power block runs while the next ones are still in production, so the campus earns from month seven instead of at the end.
Groundworks to handover, data halls to gatehouse: one contract and one team that answers for all of it.
Each power block repeats the last: the same design, the same suppliers, the same tests. The tenth block is as predictable as the first.
Your racks, your switchgear and UPS brands. A supplier who cannot hold a date is routed around, not waited on.
Liquid first, with rack positions provisioned for 300 kW, so the campus follows the hardware instead of limiting it.
The warm liquid loop is ready for district heating or industry next door, at a scale where the heat really counts.
We deliver turn-key, from groundworks and foundations through to commissioning and handover. The scope covers everything on the site: data halls, power and cooling, but also offices and storage buildings, roads, fencing, entrance security and parking.


The site is prepared once. Then the campus fills up one phase at a time: while one phase goes live, the next is being set beside it and the one after is in production in our halls.
Site works. Groundworks, roads, fencing and routes for the whole plot. The first two phases are already in production in our halls.
Phase 1 live. The first phase is commissioned and live. Phase 2 is being set beside it, phases 3 and 4 are in production.
Phase 2 live. Two phases live. Phase 3 is being set and hooked up, phase 4 is on its way from our halls.
Phase 3 live. Three phases live. The last phase is being set and commissioned.
Campus complete. Every phase live. Offices, storage, gatehouse and parking are part of the same contract.
Example of a campus in four phases. Exact phasing and timing depend on the project.
There is no fixed limit. One hall is about 4.8 MW IT. Two halls with their own mechanical yard make a power block of 9.6 MW IT, and power blocks repeat side by side. Campuses of 40 MW and beyond are built this way.
Yes. The outside is a finish, not a constraint. Cladding, colors and logos can follow your brand or the planning requirements of the site, for example timber cladding. Tell us early so it goes into the design.
Yes. Blocks are delivered and brought live one after the other, while the earlier blocks keep running. You grow at the pace of your demand.
Well-defined projects reach the factory acceptance test around five months after the design is frozen, and go live a few weeks after delivery. On a campus the blocks are built in parallel. Exact timing depends on the project.
No. The blocks stand outdoors on prepared foundations. If you want to place a data center inside a building, see Indoor retrofit and Modular stick built.
Any rack hardware. We are vendor-independent, and the blocks are designed for high density with direct liquid cooling or rear doors, as your racks need.
We support you from early concept and site design through assembly to turn-key operations. What Kontena takes on in your project is agreed in one contract.
Your load in MW, your site (or the search for one) and a target date. We come back with a first configuration and a schedule.
We come back with a first configuration and a schedule.