Data center solutions: six ways to build

Modular data center solutions from a single cluster to a large campus, outdoors or inside an existing building. Every solution uses the same factory-built, FAT-tested blocks; what changes is the scale and the setting.

Open a solution to see everything about it.
05 · Indoor deployment

Indoor retrofit

Your building becomes the data center. An existing hall rarely offers what a data center needs. That does not rule the building out, only its use as the shell.

Indoor
Cutaway render of an indoor retrofit: sealed Kontena data rooms placed inside an existing hallRender of a sealed Kontena data room inside an existing building, with windows onto the racks and a corridor along the hall
Example: 20 MW data center deployment inside an existing buildingExample: a sealed data room inside an existing hall, with a corridor along the old facade
  • 20 MWexample: inside an existing building
  • Sealedinsulated, temperature-controlled rooms
  • 0servicing inside the IT space
  • 100%factory-built and FAT-tested
How it works

A sealed room inside your building.

We place sealed, insulated, temperature-controlled data rooms inside the hall. The building keeps doing what it does well.

  1. The existing hall keeps carrying the roof, keeping the weather off and holding its permit. Its columns and spans set the layout.

  2. Closed, insulated data room modules placed inside the hall. The module is the tight, dust-free, temperature-steady room, not the building.

  3. E-Houses and transformers line up along one wall, inside the hall, outside it or in the basement, so servicing never enters the IT space.

  4. Heat rejection along the other wall or on the roof, connected to the rooms with short loops.

01020304
Example layout: six sealed data rooms between the columns of an existing hall.
Two ways to retrofit

A new hall inside, or protection for the halls you have.

Hall in hall

  • A fire-rated (EI60), airtight data hall built inside your building
  • Nitrogen fire suppression and aspirating detection in the hall
  • 2N ventilation and pressure relief
  • E-Houses in the basement, inside the hall or outside
  • Cooling plant outside, connected with short loops
  • Ready for service about six months after engineering starts

UPS retrofit

  • UPS protection for data halls that run without it today
  • A factory-built E-House per hall: an open UPS skid on a raised platform
  • A separate battery module, its own fire cell with its own suppression
  • Nothing placed inside the halls; the existing busbars stay
  • Ride-through of grid dips and outages, a clean shutdown beyond that
  • Installed hall by hall, in planned windows
Laid out around what's there

Every retrofit gets its own layout.

The structure decides how many rooms fit and where. This is what we look at first.

  • Spans and column gridWhere rooms fit between the columns
  • Clear heightRoom for two level modules and the piping
  • Floor loadingWhat the slab carries, or where it needs reinforcing
  • AccessDoors and routes for the modules to come in
  • Grid connectionPower on site today, and what it takes to add more
  • Walls and roofWhere plant can stand and where pipes can pass
Benefits

Keep the building. Add the data center.

A sealed room inside your building

You keep the roof, the footprint and the permits; we add insulated units that don't rely on the hall

Laid out around what's there

Spans, clear height, floor loading and column grid set the arrangement

Servicing stays outside the IT space

Power and cooling plant sit along the walls

From survey to live

Your building becomes the data center.

The building is prepared while the rooms are built in our halls.

  1. 01Building survey

    Spans, height, floor, access and grid checked on site.

  2. 02Layout

    Rooms laid out around the columns, plant along the walls.

  3. 03Built in our halls

    Sealed data rooms, E-Houses and cooling built in parallel.

  4. 04FAT-tested

    Every module tested before it ships.

  5. 05Brought inside

    Modules moved in and set in place.

  6. 06Live

    Connected, commissioned and handed over.

Exact timing depends on the project.

FAQ

Questions about indoor retrofit

Does the building need to be tight or air-conditioned?

No. The sealed data rooms do not rely on the hall being tight, dry or temperature-stable. The building only needs to keep the weather off.

Can we keep using part of the building?

Often, yes. The rooms take the space they need; the rest of the hall stays available.

How do the modules get inside?

Through existing doors or a temporary opening, sized in the factory to the access the building has.

How fast can it be ready?

Well-defined projects can be ready for service about six months after engineering starts. The building is prepared while the hall and the plant are built; exact timing depends on the building and the lead times.

Who handles the permit?

We prepare the technical file with you. The building keeps its existing permit; the change of use is handled in the same project.

Get in touch

Tell us your load, your site and your timeline.

We come back with a first configuration and a schedule.