A sealed room inside your building
You keep the roof, the footprint and the permits; we add insulated units that don't rely on the hall
Modular data center solutions from a single cluster to a large campus, outdoors or inside an existing building. Every solution uses the same factory-built, FAT-tested blocks; what changes is the scale and the setting.
On your own plot.
Complete data centers on your own plot. Four ways, from a single cluster to a full campus.
Inside a building.
The same engineering inside a building. Only the envelope is different.
Your building becomes the data center. An existing hall rarely offers what a data center needs. That does not rule the building out, only its use as the shell.
Indoor

We place sealed, insulated, temperature-controlled data rooms inside the hall. The building keeps doing what it does well.
The existing hall keeps carrying the roof, keeping the weather off and holding its permit. Its columns and spans set the layout.
Closed, insulated data room modules placed inside the hall. The module is the tight, dust-free, temperature-steady room, not the building.
E-Houses and transformers line up along one wall, inside the hall, outside it or in the basement, so servicing never enters the IT space.
Heat rejection along the other wall or on the roof, connected to the rooms with short loops.
The structure decides how many rooms fit and where. This is what we look at first.
You keep the roof, the footprint and the permits; we add insulated units that don't rely on the hall
Spans, clear height, floor loading and column grid set the arrangement
Power and cooling plant sit along the walls
The building is prepared while the rooms are built in our halls.
Spans, height, floor, access and grid checked on site.
Rooms laid out around the columns, plant along the walls.
Sealed data rooms, E-Houses and cooling built in parallel.
Every module tested before it ships.
Modules moved in and set in place.
Connected, commissioned and handed over.
Exact timing depends on the project.
No. The sealed data rooms do not rely on the hall being tight, dry or temperature-stable. The building only needs to keep the weather off.
Often, yes. The rooms take the space they need; the rest of the hall stays available.
Through existing doors or a temporary opening, sized in the factory to the access the building has.
Well-defined projects can be ready for service about six months after engineering starts. The building is prepared while the hall and the plant are built; exact timing depends on the building and the lead times.
We prepare the technical file with you. The building keeps its existing permit; the change of use is handled in the same project.
We come back with a first configuration and a schedule.