Home

/

M-Line Mining

/

L3 – Leopard Immersion Mining

L3 – Leopard Immersion Mining

Immersion cooling systems offer a revolutionary approach to efficiently cool electronic components, ensuring optimal performance and reliability. We containerized this system for Bitcoin and crypto mining. Everything is placed inside a 20-feet containerframe.

Price: starts at €310.000,- excl. VAT

Shipment: 12 to 15 weeks

OUR ECOSYSTEM

Introducing the M-Line ecosystem

Welcome to the future of digital asset mining with Kontena’s M-Line, an advanced ecosystem meticulously crafted for the dynamic world of data centers and mining operations. Emphasizing scalability, precision, and integration, the M-Line stands at the forefront of modular mining solutions.
Discover M-Line

M-LINE digital assest mining logo

L3

Leopard Immersion Mining

Includes drycooler and Immersion Cooling Fluid

Immersion cooling systems offer a revolutionary approach to efficiently cool electronic components, ensuring optimal performance and reliability. By fully submerging components in specialized dielectric fluids, these fluids have excellent thermal conductivity properties, allowing them to absorb heat directly from the components.

As a result, the fluids rapidly dissipate the heat, maintaining lower operating temperatures and preventing thermal throttling. And thus, optimizing the performance and reliability.

Immersion Cooling Fluid DC 20

This single-phase immersion fluid has been developed to meet the needs for data centre, edge computing, blockchain and other IT applications.

Leopard Modules

6 seperate Immersion System Modules that fit 32 S19 form factor miners. 192 in total with 6000W max on each miner

Immersion Mining Module

Cool down your miners with our Immersion Mining System. Each module is a fully seperate immersion mining system. Drown, plug and play.

In the Box

We containerized this system for Bitcoin and crypto mining. Everything is placed inside a 20-feet containerframe, except for the drycooler. Pumps, piping, electronics and racks for cryptominers are neatly fitted in the container and are designed and tested for optimal mining performances.

  • 6 seperate Immersion System Modules that fit 32 S19 form factor miners. 192 in total with 6000W max on each miner
  • single loop oil-cooling system
  • pump and oil inlet and outlet pipes to each module
  • drycooler outside, next or on top of the container
  • easy to connect and maintain system
  • delivered with our eco-friendly Immersion Cooling Fluid
  • CSC sea freight certified

Size: 2.43 x 2.59 x 6.06 m (regular 20ft DC shipping container)

Immersion Cooling Fluid DC 20


This single-phase immersion fluid has been developed to meet the needs for data centre, edge computing, immersion mining, blockchain and other IT applications.
Castrol ON Immersion Cooling Fluid DC 20 is a synthetic hydrocarbon based dielectric coolant.

  • low viscosity fluid providing excellent flow properties
  • excellent thermal properties
  • superior oxidative stability, low temperature properties and hydrolytic stability
  • excellent dielectric properties
  • compatible with most commercially available elastomers
  • Zero Global Warming Potential (GWP) cooling solution

Key Features

Modular freedom

Housed in a single 20ft ISO freight container.

Electrical freedom

No hassle, just a single unit to handle it all. Differing for each location, keeping the unit mobile might also have a positive effect on building permits and other legislation.

Environmental freedom

Offering a plug-and-play solution not only ensures easy installation but also enables a quick go-live process.

Location freedom

Our modular approach allows cost savings in both capital and operational expenses, accelerating business growth. M-Line is designed with scalability in mind, enabling integration with future deployments. Expanding you data center in a later stage is an option without the need for system interruption or difficulties. Just add more M3s and you can build as your business grows. is designed with scalability in mind, enabling integration with future deployments. Expanding you data center in a later stage is an option without the need for system interruption or difficulties. Just add more M3s and you can build as your business grows.

Workspace

You want free space to work in? Or we build a sepperate workspace unit. Or we make a bigger data center unit where you have spare room for maintenance and a computer setup.

Fast deployment

Standard models ready to be delivered in 5 to 10 weeks.